Home
Invite
RSS
Search:
Advanced Search
Select a category below on the right to view articles within that category.

Keywords: Tag: Sort by:
Crossrail tunnelling machine Jessica completes her journey
New tunnel from Limmo Peninsula to Victoria Dock is finished. Crossrail’s rail tunnels are now 83% complete Europe’s largest construction project remains on time and within budgetCrossrail’s tunnel boring machine Jessica has completed a new train tunnel from Limmo Peninsula, near...
Crossrail’s sixth and seventh tunnelling machines on their way to London
Crossrail’s sixth and seventh tunnel boring machines (TBMs) have rolled off the production line and are set to start their journey to London. Both machines have recently completed their factory testing at the Herrenknecht factory in Germany and are now in the process of being dismantled, boxed...
London’s newest ‘eastender’ begins tunnelling journey
Elizabeth becomes third tunnelling machine underway as work starts on Crossrail’s longest tunnel section Boats and barges to be used to deliver tunnel segments and remove excavated material from east London site Crossrail moved a significant step forward today as...
First trainload of excavated material from Crossrail’s tunnels leaves London for Kent
The first trainload of excavated material from Crossrail’s tunnels has left west London and been delivered to Northfleet in Kent.The first 13 wagon train left Crossrail’s Westbourne Park site for Northfleet after it was loaded with 492 tonnes of earth. A further two trains have departed this...
All Articles
Uncategorized  (4 articles)

Popular Tags